1.
Gutiérrez Franco E, La Torre Zurita F, Mejía Delgadillo G. A GENETIC ALGORITHM FOR THE RESOURCE CONSTRAINED PROJECT SCHEDULING PROBLEM (RCPSP). I&D [Internet]. 2008 Jan. 31 [cited 2025 Sep. 14];1(7). Available from: https://www1.upb.edu/revista-investigacion-desarrollo/index.php/id/article/view/94