1.
Gutiérrez Franco E, La Torre Zurita F, Mejía Delgadillo G. A GENETIC ALGORITHM FOR THE RESOURCE CONSTRAINED PROJECT SCHEDULING PROBLEM (RCPSP). I&D. 2008;1(7). Accessed September 14, 2025. https://www1.upb.edu/revista-investigacion-desarrollo/index.php/id/article/view/94