(1)
Gutiérrez Franco, E.; La Torre Zurita, F.; Mejía Delgadillo, G. A GENETIC ALGORITHM FOR THE RESOURCE CONSTRAINED PROJECT SCHEDULING PROBLEM (RCPSP). I&D 2008, 1.